What Is a Temporary Power Pole?
A temporary power pole, sometimes called a temp pole or a construction pole, is a freestanding structure that houses a meter base, breaker panel and outlets. It stands where permanent utility service will eventually connect, and it lets crews run saws, lights and pumps months before the building has real power. Most residential and light commercial jobs run on a 200 amp temporary power pole, which handles typical framing and finish work without tripping breakers every hour. Larger jobs sometimes need higher capacity, and your electrician sizes that based on equipment load. Federal Way Porta Pros does not wire the pole. We handle the site logistics around it: keeping temporary fencing clear of the utility easement, staging construction dumpster rental units away from the pole's clearance zone, and placing porta potty rental units where they will not block inspector access. A temporary power pole diagram from your electrician or the utility company shows exact meter height, grounding rod placement and conduit routing, and that diagram should exist before anyone digs.
How Does Temporary Power Pole Installation Work?
Installation starts with a call to the utility and a licensed electrician, not with Federal Way Porta Pros. The electrician sets the pole, wires the panel and schedules an inspection. Once the utility energizes it, the site has usable power for tools, light tower rental units, and job trailers. Most temporary power pole installation projects in Federal Way take one to three weeks from order to energized service, depending on utility scheduling and inspection turnaround. While that's in motion, we typically deliver portable toilet rental units and a handwashing station rental unit so the crew has sanitation from day one, since OSHA 1926.51(c) sets toilet counts by crew size regardless of whether power is live yet. If the job needs a mobile office before power arrives, a mobile office trailer rental can run on a generator in the meantime. Site access matters here too: keep at least 60 feet of clear approach if a roll-off dumpster rental truck needs to reach the same area as the pole, since that clearance is what our delivery drivers need for any roll-off drop.

What Does Temporary Power Pole Installation Cost?
Temporary power pole pricing depends on amperage, trenching distance and utility fees, and those numbers come from your electrician and the utility, not from Federal Way Porta Pros. What we can quote directly is everything around it. Below are our own rental categories for comparison, since crews often bundle power pole timing with other site rentals.
| service | day | week | month |
|---|---|---|---|
| standard toilet | 150 | 200 | 200 |
| dumpster | 75 | 600 | 108 |
| fence (per day rate) | 50 | - | - |
| storage container | - | - | 125 |
Ask your electrician for a written temporary power pole installation cost estimate before the utility schedules the meter set. For the sanitation and containment side, porta potty rental cost and dumpster rental cost pages break down our numbers further, and construction site services covers how we bundle everything for active builds.
What are temporary power pole requirements?
Requirements come from the utility company and the local electrical inspector, not from us. Generally you need a licensed electrician, a permit, correct amperage for your load, and proper grounding. Federal Way Porta Pros cannot confirm code specifics since permitting rules vary by jurisdiction and change; check with the city before scheduling.
Can Federal Way Porta Pros install my temporary power pole?
No. We are a site services company, not an electrical contractor. We handle portable restroom rental, dumpsters, fencing and storage. For the pole itself, hire a licensed electrician and coordinate with the utility serving Federal Way.
How long does temporary power pole installation take?
Usually one to three weeks, driven by utility scheduling and inspection wait times, not the physical pole-setting itself, which can happen in a day. Delays typically come from permit review or inspector backlog, so order early if your start date is fixed.
Do I need a temporary power pole for a small renovation?
Often not. Many home renovation porta potty jobs run on existing house power or a generator. Temporary poles are mainly for new construction or additions where permanent service isn't live yet. Ask your electrician if your load justifies one.
What else does a construction site need besides power?
Sanitation, fencing and waste removal. See how many porta potties do i need and OSHA portable toilet requirements for crew-size planning, and dumpster permit requirements before placing a roll-off near the pole.
Next step
Get a delivery date
Tell us the address, the dates and the headcount. We size the order and confirm the route.